archive.php

BKF Celebrates Water Week 2026

https://vimeo.com/1183855150?share=copy&fl=sv&fe=ci BKF Celebrates Water Week 2026: Engineering and Delivering Resilient Water Systems Celebrating Water Week 2026, BKF is committed to water conservation and stronger communities and are helping to shape long-term, sustainable systems across the Western United States. These range from critical infrastructure upgrades like the Springfield Water System Consolidation Project, which delivers safe, reliable […]

Carmichael Water District Kenneth Avenue Transmission Line Project Awarded to BKF

BKF was selected by the Carmichael Water District (CWD, District) for the Design for the Kenneth Avenue, Boyd, Melvin, and Vale Drive Transmission Line Replacement Project. The District desires to upgrade the existing pipelines and replace approximately 6,100 linear feet of potable water transmission main within the District’s service area. The Project will replace existing […]

Pedro Point Headlands Coastal Trail Project Awarded to BKF

We are pleased to announce that the California State Coastal Conservancy has selected our team for the Pedro Point Headlands Coastal Trail Design and Plans—a pivotal project focused on closing one of the most significant gaps in the California Coastal Trail. This initiative is more than trail construction; it is an opportunity to deliver a […]

Central Santa Clara Bicycle and Pedestrian Improvement Project Awarded to BKF

The City of Santa Clara has selected BKF to provide engineering services for the Central Santa Clara Bicycle and Pedestrian Improvement Project. The project will deliver a range of improvements, including street resurfacing, ADA-compliant curb ramps, concrete repairs, bike boulevard extensions, new bicycle facilities and sharrows, and green stormwater infrastructure. These upgrades will be implemented […]

Redwood City 2025-2026 Sanitary Sewer Capacity Improvement Project Awarded to BKF

The City of Redwood City has selected BKF Engineers to perform the design and prepare the plans, specifications, and cost estimates for the 2025-2026 Sanitary Sewer Capacity Improvement Project. The Project consists of three (3) locations with model-predicted overflowing and surcharging pipes, totaling approximately 6,000 linear feet of pipeline replacement, with a possibility of including […]

Skip to content