San Francisco County Transportation Authority Yerba Buena Island Interchange Project

Details

Client
San Francisco County Transportation Authority
Services
  • Constructability Review
  • Construction Inspection
  • Construction Management
  • Contract Management

Overview

BKF provided complete construction management for this $30M three-phase project involving realignment improvements to increase the length of the on-ramp and off-ramp on a new alignment to allow the Yerba Buena Island (YBI) WB Ramps project to function as designed.

The realignment of the Southgate Road allows the roadway to function as an extension of the on- and off-ramps for the YBI WB Ramp Project and separates the traffic heading to the westbound and eastbound Interstate 80. This traffic separation eliminated a queue spillback on Interstate 80.

To ensure all truck turning movements were accommodated, the extended ramps provide direct access from Hillcrest Road to the westbound on-ramp. The project included two cast-in-place post-tensioned box girder bridges, multiple retaining walls including a multiple level tieback wall, and concrete barriers. The project also included cast-in-drilled-hole (CIDH) piles with steel casing, significant earthwork, complicated utility relocations, drainage and temporary drainage structures, temporary bike path, and ongoing traffic control.

Various wall types were used for this project, including cantilever soldier pile and lagging walls, soldier pile and lagging walls with sub-horizontal ground anchors (SHGA) walls, semi-gravity (Caltrans standard Types 1, 5, and 7) walls, and a MSE wall. Over 375 ground anchors were being used in the SGHA walls.

The project was very challenging due to the limited, tight working area while keeping traffic running through construction. BKF provided construction management activities during all phases of construction.