Projects

UC Santa Cruz Digital Arts Facility

Details

Client
UC Santa Cruz
Services
  • Civil Engineering
  • Grading and Drainage
  • Planning/Studies
  • Site Development
  • Stormwater Pollution Prevention
  • Utility Services

Overview

BKF provided civil engineering design services for site improvements, including grading design and utility improvements for the $35M project. The three-story, 42,000 GSF building houses the Digital Arts program as well as supporting the theater, music, and visual arts department. The project has many sustainable features, including sun shading and glazing, water-reduction strategies, and innovative roofing. Incorporated into the natural landscape, a bridge connects the building entry to the campus.

Gallery

Skip to content