Search
Close this search box.

UC Aquatics Complex

As part of an architecturally led design-build team, BKF has provided the on-site and off-site civil design and surveying services for the new aquatics facility on an existing one-acre, University- owned surface parking lot.

  • Three one-story buildings
  • 52-meter swimming pool with a dive tower
  • Topographic Survey & Record Boundary Survey
  • Permitting process included DSA
  • Pursuing LEED Gold
Skip to content