BKF assisted with all phases of the Bowdoin Roundabout, including design, plan preparation, and construction support. Grading and drainage design challenges included incorporating the 100-year flood path design, while retaining the roundabout’s aesthetic value.
- Existing conditions/demolition
- Site layout/horizontal control plan
- Signage and striping plan
- Grading and drainage/utility plan
- Erosion control plan and details
- Construction documents and support