Search
Close this search box.

San Jose Trash Capture

The City of San Jose retained BKF to provide engineering services for installing hydrodynamic separator units at three new locations as part of the project’s phase V. BKF designed multiple large trash capture devices installed on existing 66-inch to 78-inch diameter storm drains. BKF also prepared plans, specifications, and cost estimates and coordinated with the San Jose Water Company and PG&E for existing utility relocation. Performing design services within four months, BKF was able to accommodate the aggressive state-mandated deadline for project completion.

Commendation Award – ACEC California 2019 Engineering Excellence Award

Skip to content