Search
Close this search box.

Mission Bay Pump Stations

BKF developed concept plans for Park Site 23 to show how the treatment volume could be metered and pumped into bioswales and bioretention facilities to meet the C.3 provisions. BKF also worked with the developer and City of San Francisco on a Storm Water Management Plan for the system.

  • 8 submersible pumps
  • Low Impact Design (LID)
  • Channel protection
  • Storm drain pipelines
  • Trash capture
  • Shoreline protection
BKF Engineers Skip to content