BKF provided civil engineering services for the installation of a new concrete U-Channel within the footprint of the existing channel. The Project Channel is approximately 8 to 9-feet wide at the base and is bounded on the upstream and downstream ends by concrete box culverts. The Project Channel is a flood control facility with tributary area of approximately 4.6 square miles. The project preserved the integrity of Marsh Road providing a safe route for motorist and pedestrians.
- APWA Structures Honor Award ($2-$5 Million)
- 1,800 linear ft. of new concrete U-Channel
- Successfully executed under severe time constraint
- Protected/improved creek conditions for state & federal listed species