Projects

Mid-Peninsula Housing Half Moon Bay Senior Campus

Details

Client
Mid-Peninsula Housing
Services
  • Civil Engineering
  • Due Diligence
  • Grading and Drainage
  • Housing Services
  • Hydrology and Hydraulic Modeling
  • Stormwater Pollution Prevention
Awards
2016 San Francisco American Institute of Architects, Social Responsibility Commendation-Award 
Award Winning Team
Owner: Mid-Peninsula Housing
Civil Engineer: BKF
Half Moon Bay Senior Campus

Overview

BKF supported Mid‑Peninsula Housing in the multi‑phase redevelopment and expansion of Half Moon Village, a six‑acre affordable senior housing community. The first phase delivered a new building with 45 senior apartments, while the second phase replaced the original 60 units and added an additional 115 homes, resulting in a total of 160 one‑ and two‑bedroom apartments with shared community spaces and integrated supportive services. BKF’s civil engineering work spanned the entire project lifecycle, from due diligence studies through construction documents, ensuring the site design met functional, regulatory, and environmental requirements.
Project responsibilities included evaluating the existing sanitary sewer and storm drain systems, identifying capacity constraints, and designing effective solutions such as below‑grade storm drain detention. The site’s proximity to Arroyo Leon Creek required careful coordination to address creek setbacks and environmental constraints. BKF provided comprehensive engineering services that facilitated a modern, service‑oriented senior living campus while enhancing long‑term site performance and resilience.

Gallery

Skip to content