Search
Close this search box.

Contra Costa Boulevard Corridor Improvements

The Contra Costa Boulevard Corridor Improvement project created a multi-modal transportation corridor to balance vehicle, pedestrian, and bicycle transportation needs. BKF was retained by the City to develop a preliminary plan and final construction documents to redevelop Contra Costa Boulevard in accordance with the principles of completes streets. BKF conducted a corridor traffic study to confirm lane geometry, width, and intersection configuration. BKF also provided environmental review, right-of-way certification, and coordination with the Caltrans Office of Local Assistance.

  • Corridor study
  • Pavement reconstruction
  • Pedestrian scale lighting
  • Widened landscape medians
  • Textured paving at critical crosswalks
  • Buffered Class II bicycle lanes
Skip to content