This $1.9M project featured a roadway median beautification and pedestrian path project along Avenue of the Flags. Construction elements included extensive sidewalk, curb, and gutter; street and pedestrian lighting; irrigation and landscape features; and street overlay. The pedestrian pathway included the installation of resin paving material.
This project required Caltrans permitting and coordination as a portion of the project was in the state right-of-way. BKF provided engineering design, construction management and inspection, and overall project administration.