BKF was involved with the site improvements design for the LEED Gold Certified Joint-Use Facility at Community College of San Francisco’s West Campus area. BKF’s work included incremental design packages associated with grading, site preparation, and import of over 250,000 cubic yards of earth material to accommodate the future West Campus area development.
- 92,000 sq. ft.
- 15-acre Balboa Reservoir site
- Incremental design of 250,000 cu. yd. earth material
- Storm water treatment measures
- LEED Gold Certification