Search
Close this search box.

Central Subway Sewer Design Build

Design-Build project of a 48-inch gravity sewer line and a 36-inch force main along 4th Street to avoid conflicts with the new San Francisco Central Subway. The project also includes modification of the 78-inch sewer line by removing the top brick portion and designing a concrete top and reconnecting all the laterals, culverts, and catch basins.

BKF Engineers Skip to content