Search
Close this search box.

AAA Station Landing

​With a rapid schedule and design-build project delivery method, BKF worked diligently to assist the team in securing entitlements and building permits. Complicated by limited site area, topographic constraints, and minimal public drainage infrastructure, BKF developed a strategy to comply with NDPES C.3 stormwater quality requirements, which include three bioretention areas that capture 80% of the average annual runoff.

  • 225,000 sq. ft., six-story building
  • Parking structure and associated site improvements
  • Stormwater quality uses 40% less water and 17% less energy than comparable buildings
  • Design-build
  • LEED Gold certified
BKF Engineers Skip to content