Search
Close this search box.

Claire Lilienthal K-8 Addition

The Claire Lilienthal Elementary School Campus project included the demolition and removal of eight portable classroom buildings, which were replaced by a new, 22,000 square foot, two-story, permanent classroom and gymnasium building. BKF provided the civil engineering design and surveying services associated with the project.

  • Replaced portables with permanent new, two-story classroom and gymnasium building
  • New amenities include additional single accommodation toilets, circulation between new and existing classrooms, utility and storage spaces
  • First prototype for a zero net energy building for the San Francisco Unified School District
  • Civil design included new utility connections to serve the building, site accessibility, and integrated storm water management
  • BKF served as the team lead for processing the project with both the City of San Francisco and the San Francisco Public Utility Commission

Photographs by Technical Imagery Studios

BKF Engineers Skip to content