Projects

Central Subway Sewer Design Build

Details

Client
San Francisco Municipal Transportation Agency
Services
  • Civil Engineering
  • Construction Engineering
  • Hydrology and Hydraulic Modeling
  • Surveying and Mapping
  • Utility Services

Overview

Design-Build project of a 48-inch gravity sewer line and a 36-inch force main along 4th Street to avoid conflicts with the new San Francisco Central Subway. The project also includes modification of the 78-inch sewer line by removing the top brick portion and designing a concrete top and reconnecting all the laterals, culverts, and catch basins.

 

Gallery

Skip to content