BKF MARKETS / Right-of-Way

San Mateo County Transit District – JPB On-Call Surveys
(San Mateo, California)

BKF worked with the PCJPB (Peninsula Corridor Joint Powers Board) to develop project study reports for grade separations of the Caltrain track and various roadways on the peninsula corridor.

  • Total of 5.8 miles of track.
  • Investigated utilities, evaluated and documented alternatives and developed construction staging plans.
  • Preliminary PSR for new tracks within portions of City of Brisbane, South San Francisco and San Bruno.
  • Design for regrading and reconstruction of streets, retaining walls, bridge structures and shoofly and main track design.

    < Back / Next >

Project Unique Features:
  • Alternative designs for four grade separations within South San Francisco and San Bruno.
  • Utility relocation and pump station design.
  • Train depot design and/or modification.